Advantage:
1. Shorter construction time
All processing in the project can be completed in the factory, and only installation work is required on the construction site. Usually it only takes 7-10 days to complete the installation of the main building;
2. Lower energy consumption
The gas film material used in the gas film trampoline hall has high reflectivity and low light absorption. In addition, the translucency of the gas film membrane ensures that the room maintains moderate natural light exposure;
3. Light weight of membrane
Can be constructed under poor geological conditions. For example: fill area, permafrost, soft soil, wet hidden loess, etc .;
4. It will not be limited by seasons and can be constructed in winter;
5. The air film trampoline hall has good sealing performance and high environmental protection index.